B21, China Town Mall, Midrand
Welcome to Afrimart OnlineWrap new offers/gift every single day on Weekends.New Coupon Code: Fast024
Something you love is now on sale! Buy Now !
QT8-15 Block Production Line

0 Customer Reviews

  • Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 05 Mar, 2026, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
  • Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
  • Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
  • Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
1. What is the QT8-15 Block Production Line?

The QT8-15 is a fully integrated block production line designed to manufacture concrete masonry products (solid blocks, hollow blocks, pavers, curbstones and other precast products) with automated batching, mixing, molding, curing and handling subsystems.

2. What production capacity can I expect from the QT8-15?

Production capacity depends on block size, mix and curing method. Typical output is in the range of 6,000–9,000 standard 200×100×60 mm blocks per 8‑hour shift. Exact capacity will be provided after confirming product types and cycle times.

3. What raw materials does the line use?

The line uses cement, sand, crushed stone/aggregate, water and optional additives or pigments. Proportions are managed by the automatic batching system to ensure consistent mixes.

4. What is the cycle time of the QT8-15 molding machine?

Cycle time varies by product and vibration/compaction settings. Typical cycle times are between 12 and 20 seconds. Final cycle time is specified during configuration and testing.

5. What level of automation and control does the system provide?

The production line is PLC-controlled with an HMI for parameter setting, production monitoring and fault diagnostics. Options include full automatic start/stop, recipe management, remote monitoring and integration with factory MES systems.

6. What utilities and power supply are required?

Standard requirement is three-phase power (typically 380–415 V, 50/60 Hz). Total installed power depends on the chosen configuration and accessories; typical ranges are provided in the technical data sheet. Compressed air and water supply are also required for some subsystems.

7. What accessories and optional equipment are available?

Common options include pan or twin-shaft mixers, automatic palletizers, block conveyors, curing racks or chambers (steam or autoclave if required), sieves, silos, and pigment dosing systems. Custom packages can be supplied to match production needs.

8. What space and foundation requirements are needed for installation?

Footprint depends on selected configuration. A level concrete foundation is typically required for the molding machine and mixer(s). Exact dimensions and foundation drawings will be provided with the order to ensure correct site preparation.

9. How many operators are needed to run the line?

A typical QT8-15 line requires 2–4 trained operators per shift for feeding, supervision, quality control and material handling. Automation reduces manpower needs but additional staff may be needed for curing, trimming and logistics.

10. What are the recommended maintenance practices?

Regular maintenance includes daily cleaning, lubrication of moving parts, weekly checks of hydraulic and vibration systems, periodic inspection of mold wear and electrical components, and timely replacement of consumable parts. A maintenance schedule will be provided.

11. How long is the warranty and what after-sales support is provided?

Standard warranty terms are typically 12 months for manufacturing defects. After-sales support includes commissioning, operator training, spare parts supply and remote troubleshooting. Extended warranties and service contracts can be arranged.

12. How long is lead time and what are delivery terms?

Lead time depends on configuration and order volume; typical delivery ranges from 30 to 90 days from order confirmation. Shipping and delivery terms (FOB, CIF, DDP, etc.) are agreed at contract stage.

13. Can the QT8-15 be customized for special products or climates?

Yes. The line can be customized for different product dimensions, production capacities, local power standards, climate considerations (e.g., cold-weather protections) and special curing processes. Engineering and customization are available during order planning.

14. What safety features are included?

Standard safety features include emergency stop buttons, guarded moving parts, interlocks on access panels, overload protection for motors and electrical protections. Optional safety upgrades and site-specific risk assessments are available.

15. How do I get a quotation or technical datasheet for the QT8-15?

Contact the sales team with your target products, desired daily capacity, available utilities and any site constraints. The supplier will provide a tailored quotation, technical datasheet, layout drawing and recommended accessories.

0

0 Overall Rating
  • 5
    0%
    0
  • 4
    0%
    0
  • 3
    0%
    0
  • 2
    0%
    0
  • 1
    0%
    0

Review this product

For you to write a review, you need to login first

Login

Latest Order Arrivals

Discover our latest orders

12 Heads Embroidery Machine
12 Heads Embroidery Machine
Dewatering Pump Machine
Dewatering Pump Machine
Order Collection
Order Collection
Portable Water Drilling Rig
Portable Water Drilling Rig
Order Usefully Collected
Order Usefully Collected
Batch of Orders
Batch of Orders
Agriculture Processing Machines
Agriculture Processing Machines
Meat Grinder Machine
Meat Grinder Machine
Water Pump Equipment
Water Pump Equipment
Packaging Machine and accessories
Packaging Machine and accessories
Fabrics Manufacturing Equipment
Fabrics Manufacturing Equipment
Mining Equipments
Mining Equipments
Food Processing Machine
Food Processing Machine
Batch of Orders
Batch of Orders
Batch of Orders
Batch of Orders
Latest Orders Labelled
Latest Orders Labelled
wheel alignment machines
wheel alignment machines
new arrivals
new arrivals
Pre Orders Offloading
Pre Orders Offloading
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals

Related Products

Recently Viewed Products